Custom-Written, AI & Plagiarism-Free with Passing "Guaranteed"

UK Based Company
Company Registration# 11483120
Address: International House, 12 Constance Street, London, United Kingdom, E16 2DQ.

3.1 Explain Master Scheduling and the scheduling concept, including procedures that improve production planning performance.

IoSCM Learner Submission Template

Qualification & Level

Diploma Level 5

Unit Title

Planning and Control in Manufacturing and Production.

Learner Name

 

Learning Outcome(s)

3.Understand Master Scheduling and the evolution of manual control systems.

4.Understand various measures to improve production planning performance.

Assessment Criteria 3

 

 

 

 

 

 

3.1 Explain Master Scheduling and the scheduling concept, including procedures that improve production planning performance.

3.2 Evaluate how manufacturing and control systems are developed and monitored to improve production planning performance.

3.3 Establish how to generate a Master Production Schedule (MPS), including Rough Cut Capacity Planning (RCCP) principles.

3.4 Clarify how production schedules relate to production control.

(WORD COUNT REQUIREMENT FOR ASSIGNMENT SUBMISSIONS – Combined word count for these questions is 1500-2000 words)

Assessment Criteria 4

4.1 Describe production planning principles and the efficiency of two production planning systems.

4.2 Discuss how a company`s sources of waste can be eradicated or reduced.

4.3 Critically evaluate benchmarking techniques and performance measures that can be used to measure production planning performance.

4.4 Critically analyse two quality improvement models using one to identify opportunities for improving production planning performance.

(WORD COUNT REQUIREMENT FOR ASSIGNMENT SUBMISSIONS – Combined word count for these questions is 1500-2000 words)

Assessment Method

Writing Assignment

Learner confirmation:

I declare that this assessment is all my work, and this submission has not, in part or whole, been knowingly submitted elsewhere for review*.

  • where the submission includes work from a previous assessment, this has been identified
  • where materials have been used from other sources, it has been appropriately recognised

If this statement is untrue, I acknowledge that an assessment offence has been committed

By signing (typing) this submission sheet, I, the learner, have read and understood all of the above

*If you are selecting ‘Approved Prior Learning’ as the Assessment Method’, please ensure your submission meets the guidelines detailed within the IoSCM Assessment Methods guide.

LEARNER SIGNATURE:

DATE:

PLEASE OVERTYPE THIS TEXT WITH YOUR NAME AND THE DATE TO PREVENT YOUR WORK FROM BEING REFERRED BACK TO YOU.

 

Assessment Criteria 3:

3.1 Explain Master Scheduling and the scheduling concept, including procedures that improve production planning performance.

Answer to be inserted here

3.2 Evaluate how manufacturing and control systems are developed and monitored to improve production planning performance.

Answer to be inserted here

3.3 Establish how to generate a Master Production Schedule (MPS), including Rough Cut Capacity Planning (RCCP) principles.

Answer to be inserted here

3.4 Clarify how production schedules relate to production control.

Answer to be inserted here

Please confirm your Actual Word Count

KEEP IN MIND THE COMBINED WORD COUNT FOR THIS SECTION IS 1500-2000 WORDS.

Assessment Criteria 4:

4.1 Describe production planning principles and the efficiency of two production planning systems.

Answer to be inserted here

4.2 Discuss how a company`s sources of waste can be eradicated or reduced.

Answer to be inserted here

4.3 Critically evaluate benchmarking techniques and performance measures that can be used to measure production planning performance.

Answer to be inserted here

4.4 Critically analyse two quality improvement models using one to identify opportunities for improving production planning performance.

Answer to be inserted here

Please confirm your Actual Word Count

KEEP IN MIND THE COMBINED WORD COUNT FOR THIS SECTION IS 1500-2000 WORDS.

References (Mandatory at Level 5 and Above)

Insert References here. (Information from books and websites used to complete your submission).

Bibliography (Mandatory at Level 5 and Above)

Insert a Bibliography here. (Extra reading that was not used as part of your submission).

IoSCM Marking Sheet Overleaf

*To be completed by the IoSCM Education Team

 

 

 

 

 

 

Learner Name

 

Qualification

IoSCM Level 5

 

Date

 

Unit Title

Planning and Control in Manufacturing and Production.

 

Tutor Name

 

Assessment Method

 

 

Mandatory Checks

Remarks

Harvard Referencing and Reference List

Applied Correctly

 

Plagiarism

Within Limit

 

Word Count

Within Limit

 

Learner Signature and Date

Available

 

 

 Assessment Criteria (AC)

 Pass or Refer

 Tutor feedback

(VARCS Valid – the work is relevant to what has been assessed and is at the right level. · Authentic – the work has been produced solely by the learner. · Reliable – the work is consistent over time. · Current – the work is still relevant at the time of assessment. · Sufficient – the work covers all of the requirements at the time)

3.1 Explain Master Scheduling and the scheduling concept, including procedures that improve production planning performance.

Pass

Refer

 

3.2 Evaluate how manufacturing and control systems are developed and monitored to improve production planning performance.

Pass

Refer

 

 

 

3.3 Establish how to generate a Master Production Schedule (MPS), including Rough Cut

Capacity Planning (RCCP) principles.

Pass

Refer

 

 

 

3.4 Clarify how production schedules relate to production control.

Pass

Refer

 

4.1 Describe production planning principles and the efficiency of two production planning systems.

Pass

Refer

 

4.2 Discuss how a company`s sources of waste can be eradicated or reduced.

Pass

Refer

 

4.3 Critically evaluate benchmarking techniques and performance measures that can be used to measure production planning performance.

Pass

Refer

 

4.4 Critically analyse two quality improvement models using one to identify opportunities for improving production planning performance.

Pass

Refer

 

           

 

Pass/Refer Outcome

 Check Here

Additional Remarks

Excellent Pass

 

Good Pass

 

Pass

 

Refer - *Re-submission required

 

* Following a 2nd Refer please contact your Tutor to arrange a call prior to your 3rd submission.

 

Tutor Developmental feedback

(Assignment Structure, Application of Theories, Principles, Work-based examples and Signposting)

 

 

 

 

Please see overleaf for useful information relating to your IoSCM Assessment Submissions.


100% Plagiarism Free & Custom Written,
tailored to your instructions
paypal checkout

The services provided by Assignment Experts UK are 100% original and custom written. We never use any paraphrasing tool, any software to generate content for e.g. Chat GPT and all other content writing tools. We ensure that the work produced by our writers is self-written and 100% plagiarism-free.

Discover more


International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

UK Registered Company # 11483120


100% Pass Guaranteed

STILL NOT CONVINCED?

We've produced some samples of what you can expect from our Academic Writing Service - these are created by our writers to show you the kind of high-quality work you'll receive. Take a look for yourself!

View Our Samples

We're Open