Custom-Written, AI & Plagiarism-Free with Passing "Guaranteed"

UK Based Company
Company Registration# 11483120
Address: International House, 12 Constance Street, London, United Kingdom, E16 2DQ.

LO1 Discuss the stages of a design process and the types of information required to communicate, share and manage the project process

Higher National Certificate Construction and the Built Environment

Unit 1 Construction Design Project

The price quoted here is for the complete assignment which includes the presentation and 5000 words, 100% Plagiarism-free and Non-AI

Student Name /ID Number

 

Unit Number and Title

Unit 1 Construction Design Project (Pearson-set)

Academic Year

2024/25

Unit Assessor

Various

Assignment Title

The impact of AI use in the construction management process.

Issue Date

2024/25

Submission Date

Individually negotiated

Assignment Writer

 

IV Name

 

Submission Format:

  1. Report (3000-5000 words) Software: Word

Font: Aerial size 12 Line spacing: 0

2. Presentation (10-15 minutes)

Assignment brief and student declaration to be submitted in the front of the report.

Unit Learning Outcomes:

LO1 Discuss the stages of a design process and the types of information required to communicate, share and manage the project process.

LO2 Explain the different types of construction information developed through the course of a project. LO3 Produce design propositions that address project requirements defined through feasibility stages. LO4 Present a construction information package, highlighting the coordination of information between different project stakeholders to ensure accuracy.

Assignment Brief and Guidance:

The Pearson-set theme for use with Unit 1: Construction Design Project is

Theme: Artificial intelligence and emerging technologies

Topic : The impact of AI use in the construction management process.

(Year 24-25) * (Note this changes each year)

The construction management process is still considered a largely unstructured and reactive process. However, with the correct use of AI construction companies can significantly improve the organisation and efficiency of the process.

The theme of “The impact of AI use in the construction management process” will allow you to investigate how AI can be used to transform the way construction projects are managed and to harness the many benefits.

BRIEF

You are employed as trainee engineer in a construction engineering and design company. A local newspaper is running a series related to `the impact of Artificial intelligence` in different industries. Their particular approach is to have individuals, who have recently entered the sector, to respond in order to gain their views of the impact of AI within their industry. Those selected are asked to produce a report and give a presentation in response to the topic.

Your employer has requested that you produce a report and presentation. The topic for your report and presentation is to be “The impact of AI use in the construction management process”. Your employer has provided you with a brief for a small commercial building, including site information and project requirements (see Appendix 1).

(Note: You can agree on using a local project that you have knowledge about which can provide suficient evidence to meet this unit. Please agree this with your tutor before progressing)

You will need to produce a Construction Information Package (a set of construction drawings and details), using industry-standard tools and techniques. In addition, you will need to develop a specification (either an `outline` specification or for a single element of the building) and a set of schedules (door and window). To accompany these, you will prepare the `prelims` for the specification and a simple schedule of works.

In discussion with your employer, you have agreed a structure for the report. Using the materials you have developed above, along with additional research, your report will describe the stages of a construction design process and the types of information required at different stages of a project; assessing the relationships between design and project stages and how information is shared throughout. To illustrate this, you may wish to use the sketches or models used in developing your design proposal. You will also use the brief (provided by your employer) to explain the requirements of the project and the relationship between drawings, schedules and specifications (here you can include images from the work that you have produced).

As the focus of the report is to explore the impact of AI on the construction management process, you will want to ensure that you are explaining how AI impacts at each of the different stages in the project. As a part of this, you should give your analysis of how design and construction information flows are related to contractual relationships. Within your report include an evaluation of how coordination of information can help to ensure accuracy and how this leads to quality, and how the use of AI will impact the process.

Finally, using drawings, specifications and schedules that you have produced, you should create and present a 10-15 minute presentation of your design project to an audience of specialists and non -specialists.

Your report should be suitably titled, contain a contents page, use citations from researched construction related sources and include around 10 references.

Instructions and guidance to candidates

Your Construction Information Package should be made available as a set of PDF documents. Remember, these are intended to be downloadable so manage your file sizes appropriately (do not output super high-resolution A0 sized sheets!). It is best to keep the page sizes to A3 maximum. Because these are to be viewed on screen, images do not need to be large or high-resolution. As a guide, a 1024 × 768 image at 96dpi will be more than sufficient for on-screen viewing.

Note: All information sources and resources, including websites used to complete this assignment must be stated and correctly referenced in the document and/or presentation. No credit will be given for wholesale copying from information sources and checks for plagiarism may be made on your submitted work.

Learning Outcomes and Assessment Criteria

Pass

Merit

Distinction

LO1 Discuss the stages of a design process and the types of information required to communicate, share and manage the project process

D1 Critically evaluate the relationship between design and project stages, highlighting the processes and procedures to ensure information coordination throughout.

P1 Describe the stages and activities of a construction design process.

P2 Explain the types of information required throughout the different stages of a project process.

M1 Assess the relationship between design and project stages, and the information sharing requirements in each.

LO2 Explain the different types of construction information developed through the course of a project

P3 Examine a brief to ascertain the requirements of a building project.

P4 Outline the relationships between drawings, schedules and specifications.

 

M2 Analyse the importance of clash detection and information coordination.

LO3 Produce design propositions that address project requirements defined through feasibility stages

D2 Evaluate a package of construction information, in relation to their coordination and accuracy.

P5 Create construction drawings and details using industry-standard tools and techniques.

P6 Produce specifications, schedules and an outline construction health & safety phase plan for a given project.

M3 Prepare specification prelims and schedule of works, in coordination with construction drawings and details.

LO4 Present a construction information package, highlighting the coordination of information between different project stakeholders to ensure accuracy.

P7 Present construction information to an audience of specialists and non specialists.

P8 Explain the coordination and information sharing between different roles and stakeholders in a construction project.

M4 Analyse the ways in which different forms of contractual relationships between stakeholders influence flow of information in a construction project.

Appendix 1

Commercial Building Client Brief

The following drawing indicates a plot of land upon which sits an existing scout hut. The client wishes to develop the site so it contains a community building that can be utilised by different groups within the local community.

The client has stated the following design characteristics required:

Materials

  • The building is to be constructed using sustainable materials.
  • The materials should be recyclable at the end of the building’s life.
  • Local materials are to be sourced.
  • Consideration should be given to environmental certification and product declaration.
  • Any suitable material can be selected by you.

Shape

  • The building needs to follow the existing footprint (18.5 m x 11.5 m)
  • The max height for a roof is 4.5 m to the top of the ridge.
  • The height to the eaves is 2.5m.

Colours

  • You have discretion in selecting colours that are neutral and will blend in with the surrounding street scene.

Fenestration

  • Large entrance doors that are secure.
  • No windows to the sides.
  • Rear elevation can contain large areas of glass.

Other considerations

  • Rear of the building will be used as a terraced area to entertain leading from the main building.
  • Car parking will be at the rear of the plot.
  • Toilets unisex can be utilised.
  • A large kitchen area will be required for food preparation.
  • A small office will be required.
  • A main dining/community functional area/hall is required for the main part of the building.

100% Plagiarism Free & Custom Written,
tailored to your instructions

paypal checkout

The services provided by Assignment Experts UK are 100% original and custom written. We never use any paraphrasing tool, any software to generate content for e.g. Chat GPT and all other content writing tools. We ensure that the work produced by our writers is self-written and 100% plagiarism-free.

Discover more


International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

UK Registered Company # 11483120


100% Pass Guaranteed

STILL NOT CONVINCED?

We've produced some samples of what you can expect from our Academic Writing Service - these are created by our writers to show you the kind of high-quality work you'll receive. Take a look for yourself!

View Our Samples

We're Open